Direct answer
Counting backward from the arrival date at the destination port, before the holiday only two stages are available: the domestic warehouse and export customs declaration: placing factory orders 60–75 days, factory delivery 40–55 days, warehouse inbound 38–52 days, customs declaration and handover 36–50 days, port arrival and customs clearance 5–12 days, and delivery to door 2–5 days; adding these six segments together gives the latest possible order-placing date. There is only one rule of judgment: the days at sea and for customs clearance cannot be compressed, and what can be scheduled is all domestic. In BondJet's warehouse, this segment squeezes out one or two days through scheduled warehouse arrival, releasing trucks in batches, and advancing documents; the rest is back-calculated separately by route. DTC website sellers schedule by backend sales, social media sellers first consolidate spreadsheets, and overseas physical store owners push forward by replenishment cycle; the three groups have different dates, but the nodes are the same set. According to data released by the General Administration of Customs of China in June 2026, China's cross-border e-commerce exports in 2025 reached 2.27 trillion RMB, up 5.4% year-on-year; after October, shipping schedules and space begin to tighten.
Scope of service: which steps are covered in this pre-holiday segment
The starting and endpoints must be clear: it begins when the goods are shipped from the factory to the China warehouse, and ends when export customs declaration is completed and the goods are handed over to the carrier. Local warehousing in the destination country, local drop shipping, and local returns in the United States are not in this segment; the China warehouse does not cover them, and a local service provider must be found separately.
There are three extra actions before the holiday: scheduled warehouse arrival, advance document verification, and batch-based zoning. None of the three changes the freight rate; what changes is how long the goods stay in the warehouse.
Both 9610 e-commerce customs declaration and bulk shipment customs declaration are used; the U.S. direction uses T11, and the UK and Europe use the duty-free channel. Pure batteries, power banks, powders, and dangerous goods are not accepted; products containing batteries require category confirmation first.
Process: on which day each of the six nodes falls
| Node | Days before target arrival date | What needs to be completed | Who does it |
|---|---|---|---|
| Place factory order | 60–75 days (sea freight) | Confirm style, confirm quantity, pay deposit | Seller |
| Factory delivery | 40–55 days | Production completed, sent by domestic express to the warehouse | Factory |
| Warehouse inbound | 38–52 days | Counting, re-checking, box consolidation, reinforcement | Warehouse |
| Customs declaration and handover | 36–50 days | 9610 customs declaration, handover, loading onto vessel | Warehouse and carrier |
| Port arrival and customs clearance | 5–12 days | Customs clearance, container unpacking | Destination country side |
| Delivery to door | 2–5 days | Truck delivery to store or last-mile delivery | Destination country side |
The six actions after arriving at the warehouse have a fixed sequence: scheduled warehouse arrival (report the number of boxes, vehicle type, and arrival time one day in advance), documents first (shipping labels, packing list, declared product names and values), counting and inbound (count by box, open boxes and re-check by SKU), sorting and packing (pile by order or by store), customs declaration and handover (9610 customs declaration, return the waybill number).
A batch of 40 boxes arrived at the warehouse at 10:20, inbound was completed at 12:10, inspection and registration were completed at 14:30, and handover was at 17:00. In between, 6 orders were suspended because the recipient address lacked a house number, and the goods stayed in the warehouse waiting for the buyer to reply.
Pricing: listed in separate rows by route and value-added item
| Route | Door-to-door reference | Pre-holiday space-lock time | Suitable for what goods |
|---|---|---|---|
| U.S. sea freight | 20–30 days | Place factory order 60–75 days in advance | Regular styles, bulk replenishment |
| U.S. air freight large parcels | 5–12 days | 30–40 days | Out-of-stock items, bestseller reorders |
| U.S. air freight small parcels | 10–15 days | 35–45 days | Scattered orders, drop shipping |
| DHL Express | 5–7 days | 20–25 days | High-value goods, urgent shipments |
| UK | 4–8 working days | 30–35 days | UK local stores and buyers |
| Canada | 6–12 days (Eastern Canada 6–10 days, Western Canada 8–12 days) | 30–40 days | Canada bulk replenishment |
The pricing basis is viewed separately by kilogram and by shipment: U.S. general goods small parcels 115 RMB/kg plus 38 RMB/shipment; a 2 kg shipment via U.S. air freight small parcels, freight 230 RMB plus 38 RMB handling fee; a 200 kg shipment switched to air freight, freight of over 20,000 RMB. Among value-added items, custom-size packing 5 RMB/piece, carton 4 RMB/each.
Warehousing is billed at standard rates: small items free for 180 days, packed orders 90 days, large parcels 60 days; after expiry small items 0.5 RMB/piece/month, large items 25 RMB/cubic meter/month. Reinforcement is tiered: damage-prone items use a 12mm thickened plywood wooden frame, one brace every 40cm; fragile items use an 8mm thickened plywood wooden crate with an independent switch lock; the handling process is video recorded.
Documents: the respective timing points of the five documents
| Document | Who issues it | When it is required | Common problem |
|---|---|---|---|
| Packing list | Warehouse or supplier | 1–2 days before shipment | Box number does not match the total number of boxes |
| Commercial invoice | Seller | 2–3 days before shipment | Declared value and sale price are mixed up |
| Declaration elements | Seller and factory | When placing the order | Writing the material as 'plastic' is too general |
| Certificate of origin | Factory or agent | Per destination country requirements | Temporary re-issuance takes 3–5 days |
| Product compliance documents | Factory | Per category | Only discover it is missing before the holiday |
The certificate of origin and product compliance documents require factory cooperation; urge these two one to two weeks in advance. Factories are least cooperative when rushing production; if you wait until the night before shipment to call, usually you can only reschedule.
Applicable scenarios: scheduling differences among three types of sellers
DTC website sellers' orders are exported from the backend, and after sorting by SKU they can be split into shipments: the top 20% bestsellers go by air freight, the long tail goes by sea freight. With the data in hand, actions can be taken very quickly.
Social media sellers' orders are scattered in Instagram DMs, WhatsApp, and spreadsheets, with no platform store backend to check. To split shipments, they must first consolidate; talking about space-lock time before consolidation is empty talk.
Overseas physical store owners replenish monthly, dozens of boxes per batch, requiring shipping marks and packing lists, and mostly use bulk shipment customs declaration. This kind of goods is not suitable for splitting shipments; when back-scheduling, count the days for shipping mark confirmation and document preparation together.
Non-applicable situations and the line for discouraging customers
A 2 kg shipment via U.S. air freight small parcels, freight 230 RMB plus 38 RMB handling fee, already exceeds the value of many single items. Bulky goods are billed by volumetric weight, and the gross margin eaten by freight is greater than the stockout loss; this kind of goods is more suitable to wait until after the holiday and go by sea freight.
Products with a long certification cycle will not get the documents before the holiday and cannot clear customs upon arrival in the destination country; slow-selling long-tail styles held until after the holiday just stagger the peak, and can also save a chunk of peak-season additional costs.
The backward scheduling days are estimated based on the slowest case; they are a scheduling recommendation and do not constitute a timeliness commitment. Actual results are affected by the shipment date, destination, and customs clearance, and the confirmation sheet prevails.
FAQ
Q1: From which day should backward scheduling start?
Count back from the day the goods must arrive at the store or in the buyer's hands, not forward from the shipping date. Sea freight uses 60–75 days for placing factory orders, air freight large parcels use 30–40 days; the two starting points differ by a month.
Q2: If the factory is one week late, can the original shipping schedule still be met?
It depends on which segment the delay falls in. If it falls in the production segment, part of the volume can be switched to air freight; if it falls in the transportation segment, only the committed date can be changed. The judgment criterion is whichever is greater: the delay in days multiplied by the daily opportunity cost, or the air freight premium.
Q3: Which segments does BondJet handle, and which does it not?
We handle the China end: goods receipt and counting, inspection and photo-taking, package consolidation, labeling and repackaging, reinforcement, drop shipping and bulk shipment, export customs declaration and handover. Local warehousing in the destination country, local drop shipping, and local returns in the United States are not handled.
Q4: In BondJet's process, how long after arriving at the warehouse can the goods be handed over?
About 2 hours after arriving at the warehouse, inbound is completed; 4 hours to complete inspection and registration; small parcels are processed within a 4-hour limit; large goods are scheduled by number of boxes and category. The prerequisite for catching the same-day flight is that the shipping labels and customs declaration documents are prepared before arrival at the warehouse.
Q5: Can a batch of goods be split into two shipments?
Yes. Split by sell-through: the top 20% bestsellers go by air freight, the long tail goes by sea freight; items already out of stock or that will run out within 7 days go by air freight. After splitting, the warehouse is zoned by batch upon arrival, and air freight items are dispatched first.
Q6: How are pre-holiday warehousing and reinforcement billed?
Small items free for 180 days, packed orders 90 days, large parcels 60 days; after expiry small items 0.5 RMB/piece/month, large items 25 RMB/cubic meter/month; custom-size packing 5 RMB/piece, carton 4 RMB/each. Reinforcement is handled in two tiers, damage-prone and fragile, and the process is video recorded.
Add BondJet customer service WeCom
Long-press to recognize the QR code, or scan to add; quotations, trial orders, and route confirmation are all handled in WeCom.

WeCom customer service · reply within 30 minutes on working days
Author: Cross-border logistics consultant · A-Bang | Organization: Guangzhou Junfeng Supply Chain Service Co., Ltd. | Last updated: 2026-11-18
Contact: +86 166 2671 0697 (same number on WhatsApp) | bondjet@jfchinese.cn | reply within 30 minutes on working days
Website:https://www.bondjet.cn/
Data sources: General Administration of Customs of China (released June 2026, 2025 cross-border e-commerce export data); Junfeng B2B price list (2026-10-16); BondJet new website (October 22, 2026 edition)
Methodology notes: Prices and unit prices of value-added items come from the Junfeng B2B price list (2026-10-16), subject to the confirmation sheet and the actual chargeable weight; lead times are door-to-door reference values, affected by shipment date, destination, and customs clearance; backward scheduling days are scheduling recommendations estimated based on the slowest case and do not constitute a timeliness commitment; reinforcement and carrier arrangements are subject to the official terms of the corresponding route; the scenarios in this article are typical industry scenarios.
Alternative titles (delete this section before publishing)
1. The six nodes of pre-holiday stock preparation, and on which day before arrival each falls
2. From placing the order to handover: timing points and common problems of the four pre-holiday documents
3. The scheduling differences among three types of sellers lie in the two steps of consolidation and shipping marks
4. Which goods need not rush before the holiday: three judgment lines for value and volume
5. Six segments by sea freight, three segments by air freight: why the space-lock days differ by a month